| 1. Working draft “Reference of CCL telemechanic suite to waterworks facility at PK 539 BR in Kashkadarya region” |
| 2. Working draft “Reference of Uzbekistan telemechanic suite to facilities of Malek channel in Syrdarya region” |
| 3. Working draft “Reference of CCL 2 telemechanic suite to Verkhne-Chirchirskuy waterworks facility” |
| 4. Working draft “Reference of КТМ- 22.01 suite to drainage wells in Bayaut district” |
| 5. Working draft “Reference of СТМ-2 system to facilities of Shakhrud-Duaba channel” |
| 6. Working draft “Restructuring of production rooms of Uzvodpriboravtomatika Design and Production Engineering Office” |
| 7. Working draft “Reference of КЛС-2 to waterworks facilities of Gisarak reservoir and Aksuy waterworks (Kashkadarya region)” |
| 8. Working draft “Automation and teleautomation of the 1st stage of LEOS, Stavropol Territory” |
| 9. Working draft “Central control and management system for Right-Bank Channel facilities in Navoi region” |
| 10. Working draft “Teleautomation of Babkent-Darya system in Bukhara region” |
| 11. Working draft “Reference of КЛС-2 to waterworks of Chegem water supply and irrigation system in Kabardino-Balkaria” |
| 12. Working draft “Reference of water measuring facilities to meliorative network of Boyaut district, Syrdarya region” |
| 13. Detailed design “Automation and teleautomation of left ShMK line” |
| 14. Detailed design “Teleautomation of K-3 channel in Syrdarya region” |
| 15. Working draft “Development of standard solutions for reference of КЛС-2 to headworks of Nevinno-Myssk channel” |
| 16. Working draft “Teleautomation of Shovot and Toss channels in Navoi region” |
| 17. Working draft “Reference of КЛС-2 to waterworks of Alek irrigation system in Altai Territory” |
| 18. Working draft “Reference of КЛС-1 to headworks of YGK” |
| 19. Working draft “Standard solutions for reference of КТМ-2-01 telemechanics to waterworks of Novo-Aleksandrovsk channel” |
| 20. Working draft “Reference of КЛС-3 telemechanic suite to Novostroy pumping stations in Altai Territory” |
| 21. Working draft “Teleautomation of Ulugbek pumping stations at 1st and 2d lifts in Samarkand region” |
| 22. Working draft “Reference of water measuring facilities in Khiva district, Khoresm region” |
| 23. Working draft “Reference of water measuring facilities in Khiva district, Khoresm region” |
| 24. Working draft “Restructuring and automation of Sayat pumping stations in Bukhara region” |
| 25. Working draft “Restructuring pumping stations at the work-study unit of Tashkent Institute of Agricultural Sciences” |
| 26. Working draft “Automation and teleautomation of PK 10 channel facilities in Tashkent region” |
| 27. Working draft “Mounting of hydraulic automated devices at GK 9+20 Left-Bank Karasu in Tashkent region” |
| 28. Working draft “Teleautomation of right line channel of YGK” |
| 29. Working draft “Restructuring and automation of Sayat pumping stations in Bukhara region” |
| 30. Working draft “Teleautomation of Ulugbek pumping stations at 1st and 2d lifts in Samarkand region” |
| 31. Working draft “Attachment to working draft. Teleautomation of drainage wells in Kogan district, Bukhara region” |
| 32. Working draft “Reference of СТМ-2 system and telemechanics to waterworks facility in Takhiatash district of Bukhara region” |
| 33. Detailed design “Reference of ИУУ gauging stations to facilities at PK 22 ПБК ВЗВУ” |
| 34. Detailed design “Tashkent reservoir teleautomation” |
| 35. Working draft “Teleautomation of pumping stations of seaside irrigation system in Rostov region” |
| 36. Working draft “Teleautomation of pumping stations in Veselyy district, Rostov region” |
| 37. Working draft “Automation and teleautomation of Yubileynaya and Ramadan pumping stations in Tashkent region” |
| 38. Working draft “Automation and teleautomation of Tambov waterworks” |
| 39. Working draft “Reference of КЛС-2 to facilities in Kara-Kalpak” |
| 40. Working draft “Reference of КЛС-2 to Palvon-Koneges waterworks in Khoresm region” |
| 41. Detailed design “Temporary electric power supply of facilities of Uzvodpriboravtomatika Design and Production Engineering Office” |
| 42. Working draft “Complete repair of automated facilities at ПК-75;122;185, left line of Tashkent channel” |
| 43. Working draft “Automation and teleautomation of Irrigator-Yubileynaya-Bakhor pumping stations in Namangan region” |
| 44. Working draft “Reference of КЛС-2 telemechanic devices to Abdumuslim waterworks facilities in Kyzyltepa district” |
| 45. Working draft “Reference of КЛС-2 telemechanic devices to headworks of October Revolution Channel (ORC) in Dagestan” |
| 46. Working draft “Reference of water measuring facilities to meliorative network of Boyaut district, Syrdarya region” |
| 47. Working draft “Reference of КЛС-2 device to Khar-Khur waterworks at L37 and 50 Let October pickets in Bukhara region” |
| 48. Working draft “Reference of КЛС-2 telemechanic devices to Telman 2B waterworks in Karakaplpakiya” |
| 49. Working draft “Reference of КЛС-3 system to Aksay irrigation system in Checheno-Ingooshetia” |
| 50. Working draft “Reference of Uzbekistan telemechanic suite to facilities of Malek channel in Syrdarya region” |
| 51. Working draft “Communication line for telemechanic suite of Malek channel in Syrdarya region” |
| 52. Working draft “Automation and teleautomation of PK 10 channel facilities in Tashkent region” |
| 53. Working draft “Attachment to working draft. Teleautomation of drainage wells in Kogan district, Bukhara region” |
| 54. Working draft “Reference of telemechanics to facilities of Kerli watreworks in Navoi region” |
| 55. Detailed design “Reference of СТМ-2 system to facilities of P-8 channel” |
| 56. Working draft “Remote control and management of Chorbokir waterworks” |
| 57. Working draft “Teleautomation of drainage wells in Kogan district, Bukhara region” |
| 58. Working draft “Implementationof flowmeters at distributor of Tashkent channel left line (GK 186)” |
| 59. Detailed design “Teleautomation of left-bank channel of Upper buffer of Kurgan HPP area” |
| 60. Detailed design “Reference of ОТМХ telemechanics to facilities of ВЗВУ” |
| 61. Working draft “Teleautomation of a channel at Malek line in Syrdarya region” |
| 62. Working draft “Reference of КТМ ,КТМ-11.01 telemechanic suite to waterworks of Chernovo and Gidridish irrigation systems in Orenburg region” |
| 63. Working draft “Restructuring and automation of Sayat pumping stations in Bukhara region” |
| 64. Working draft “Reference of КТМ-11.01 telemechanic suite to waterworks of Kattakurgan reservoir in Samarkand region” |
| 65. Working draft “Reference of КТМ-11.01 telemechanic suite to waterworks of Kulunda channel in Altai Twrritory” |
| 66. Working draft “Reference of КЛС2 telemechanic suite to waterworks of Kamashin reservoire in Kashkadarya region” |
| 67. Working draft “Teleautomation of pumping stations of Akhtuba group water supply system in Astrakhan region” |
| 68. Working draft “Teleautomation of Kommunar system facilities” |
| 69. Working draft “Water discharge through hydraulic automatic devices from P-102 (ПК66 + 70) channel in Pskent district of Tashkent region for complete repair of facilities” |
| 70. Working draft “Teleautomation of Mono-Kabardinskiy Nadterechnyy channel in Kabardino-Balkaria” |
| 71. Attachment to notifications: 1) ПТК1-5-79; 2) ИУУ1-9-82; 3) ИУУ4-11-82; 4) ИУУ9-10-82; |
| 72. Attachment to notifications: 1) КЛС1-4-86; 2) КТМ1-8-86; 3) ППС1-1-86; 4) САУ-2-86; 5) УЗСУ1-1-86; 6) УТЛ1-1-86; 7) УТМ1-1-86. |
| 73. Time standards 1988 |
| 74. Technical documents: water gauges, PA Namanganremvod, PUMK Kanal SFK. |
| 75. Meliorative parameters recorder, Ivontayevka, RPS Iskra, 1987г. |
| 76. Working draft “Teleautomation of Orzgir irrigation system facilities in Stavropol Territory” |
| 77. Working draft “Electrical standard: technical documents” |
| 78. General-purpose stand for calibration and testing of СИУ2 valve position sensors |
| 79. Water based dispersion system– 400А. |
| 80. Mechanical description, operational manual and Specification sheet, Protos.000.000.000PS. |
| 81. Working draft “Reference of КЛС3 telemechanic suite to pumping stations of Zolotoy Bugor irrigation system Yenotayevka district, Astrakha |
| 82. Working draft “Reference of КТМ-11-01 telemechanic suite to waterworks of Kulunda channel in Altai Twrritory” |
| 83. Detailed design “Automation and teleautomation of Teshik-Tash waterworks” |
| 84.Notifications 1977-1987 |
| 85. Text documents КОД1, КОД 11. |
| 86. Notifications: 1) ИПЛ1-2; 2) УПП1-2; 3) УПС1-2; 4) УПР1-2; 5) ППС1. |
| 87. Text documents: 1) КТМ-22-01; 2) УТЛ-1 |
| 88. Text documents: 1) КНС1÷7; 2) ПТК; 3) УСК1-2;4) ФТС. |
| 89. Text documents САУ1. |
| 90. Text documents: 1) Data sheets; 2)Programming tables; 3)Approval lists. |
| 91. Text documents КТМ 11-01: 1)Forms;2)ЗИ ;3)ПМ; 4)КУ;5)ВП;6)ВС. |
| 92. Text documents ИУУО: Data sheets:1) РЭ; 2) КУ; 3) ПФ; 4) ПЗ; 5) ПТ; 6) ПМ; 7) ВС; 8) ВП; 9) ЗИ. |